SBIR/STTR Research Award

Cost Reduction Technology for Neutron Absorbers in Microreactor Applications

Award identifier 6d2cce2621d9a60af1374da57f2bea1438529a9d4eaa94b87a0872a2d92dff36Awarding agency Department of Energy

Award amount

$1,149,841

Program and phase

SBIR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
MILLENNITEK, LLC
Proposal award date
2023-08-21
Contract end date
2025-08-20
UEI
GBD5NGRLNM83
Solicitation number
Not reported
Topic code
C54-36n

Research abstract

Microreactor technology has the potential to supply off-grid power to a diverse base of applications including data centers, mines, remote communities, electric vehicle charging stations, and industrial plants, among many others. While several companies have made considerable progress in the technology that can make these reactor systems feasible from a technical standpoint, there is still an economic hurdle to overcome to compete with other remote off-grid power technologies such as solar, fossil energy (natural gas/diesel), wind, micro-hydro, and fuel cells. While component costs for nuclear power plants at grid-scale can seem relatively low, at the microscale some of these components play an outsized role in either the capital or operational cost of the reactor system. One specific example is the neutron absorber and shielding components that are critical to the design and operation of most fission power plants. Currently however, there is limited domestic manufacturing capability for these critical raw materials and the current high component price is limiting the economic competitiveness of microreactor technologies. MillenniTEK is proposing to demonstrate a unique fabrication technology to produce neutron absorbing and shielding components that can support lower installed capital and operating costs that have an outsized effect on the economics of microreactors. A significant constraint is the fact that both the traditional raw materials and forming processes are prohibitively expensive and limit the economic competitiveness of microreactors. In the Phase I project, we were able to successfully synthesize the raw material in a continuous process, and consolidate it into a representative microreactor component geometry. The Phase II project will scale the process and involve significant collaboration with leading microreactor development companies to perform case studies using the lower cost components. A goal by the end of Phase II is to demonstrate the feasibility of reducing the manufacturing costs by >25% over what is currently available for these components and to have delivered multiple prototype components to our commercial microreactor customers. In addition to microreactor applications, there are other significant potential areas where this innovation could be commercialized, including small modular reactors, advanced reactors for Gen IV nuclear plants, fusion power, nuclear thermal propulsion, and fission power reactors for lunar and Mars surface use.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

15 SBIR/STTR records share this UEI (2014–2023). Reported award amounts total $8,633,942. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.