SBIR/STTR Research Award

Floating Platform for Cost-effective Airborne Wind Energy Offshore

Award identifier 058c1e10c90e1e05739a3aa94dfd12be4391f9d492dbf5e5bab59ad5dc3c3382Awarding agency Department of Energy

Award amount

$199,879

Program and phase

SBIR · Phase I

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
WINDLIFT INC.
Proposal award date
2023-07-10
Contract end date
2024-04-09
UEI
MY6KUXGLF1F4
Solicitation number
DE-FOA-0002903
Topic code
C56-17a

Research abstract

The offshore wind deployment pipeline in the US as planned is sufficient to reach the National Offshore Wind Energy Target of 30GW by 2030, but comparatively high costs, supply chain bottlenecks, and the lack of specialized infrastructure present significant barriers to success. A recent report published by the National Renewable Energy Laboratory suggests that offshore wind deployment is likely to fall short of that target by over 50%, and that project delays are likely to compound over time beyond 2030. These three challenges are inherently linked to the increasingly large traditional turbines that dominate the offshore wind industry today, but incremental improvements supporting the incumbent technology may not be sufficient to overcome these barriers.Airborne Wind Energy is an emerging technology that can harness wind energy resources cost-effectively by using dramatically less material, and without relying on the custom ships and ports that are required to install traditional turbines. This proposal will design a floating platform and anchoring and mooring system to enables Airborne Wind Energy technology in the offshore environment.Initial design work on a variety of concepts has already been conducted. Work during phase I will investigate the most promising designs by conducting feasibility studies on each one, evaluating them against industry standard specifications, and building preliminary cost models. The output of Phase I will be a strong conceptual design supportive of cost and performance targets, which will be the subject of a detailed design effort to be conducted in Phase II.This technology has the potential to deliver wind energy capacity using 90% less steel, 93% less carbon fiber and 96% less Rare Earth Magnets than traditional turbines. The long-term value proposition is to increase offshore wind adoption by producing lower cost electricity and expanding the market by capturing wind energy potential at sites current technology cannot economically or physically access.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

6 SBIR/STTR records share this UEI (2011–2023). Reported award amounts total $2,065,646. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.