STTR Phase II:Ultra-thin Laminar Flywheels for Utility Scale Energy Storage

Award identifier f4888fd00b9cddf97e05cbb6aa9ec000636d10017f25d86ad9acc6173dbbf761Awarding agency National Science Foundation

Award amount

$1,000,000

Program and phase

STTR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
Revterra Corporation
Proposal award date
2023-06-15
Contract end date
2025-05-31
UEI
KRPXJQYMAGW9
Solicitation number
NSF 22-552
Topic code
PM

Research abstract

The broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase II project is to reduce power infrastructure bottlenecks to the deployment of electric vehicle fast chargers. Typically, it is expensive to install high power electric vehicle fast chargers because of limited power availability or demand charges. A large network of electric vehicle fast chargers would reduce range anxiety among electric vehicle drivers and accelerate the electrification of transportation overall. Energy storage systems can be used to build a “buffer” between low power availability at a site and high-power fast chargers by accumulating and then rapidly discharging energy, but conventional chemical batteries have a limited cycle life which degrades faster in high-power applications. Kinetic batteries (such as those based on flywheels), on the other hand, could enable this without having to be replaced and without hazardous byproducts. Modular, cost-effective “buffers” could be deployed anywhere and everywhere an electric vehicle fast charger is required and where power availability is limited._x000D_ _x000D_ This STTR Phase II project proposes to fabricate, test, and deploy a pilot 100 kWh / 400 kW modular kinetic battery system into a 350 kW electric vehicle charging station along with commercial partners to validate whether the system can act as a drop-in solution. This project enables high-power, fast electric vehicle charging utilizing the existing, low-power grid connections. This project has three basic objectives: 1) fabricate a kinetic battery module with 100 kWh energy storage capacity and 400 kW power output, 2) conduct a rigorous test of the kinetic battery as part of a high-power electric vehicle charger, and 3) design a high-power, alternating current homopolar motor/generator which can provide damping forces to the rotor passively via its windings. This kinetic battery system implements a passively stable magnetic bearing system which enables larger module sizes (reduces balance of system costs and operating expenses) and can connect to the grid synchronously, eliminating the need for costly power electronics and enabling it to provide grid-stabilizing physical inertia as an ancillary service._x000D_ _x000D_ This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

3 SBIR/STTR records share this UEI (2020–2023). Reported award amounts total $2,223,500. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: National Science Foundation

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.