SBIR/STTR Research Award

High Strain Composite Booms for Sampling, Mobility and Manipulation

Award identifier c099ddd6bdf2da04a71c1652c816cf7eff28fd9424157cb520a47939d009056dAwarding agency National Aeronautics and Space Administration

Award amount

$895,090

Program and phase

SBIR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
OPTERUS RESEARCH AND DEVELOPMENT, INC
Proposal award date
2023-05-23
Contract end date
2025-05-22
UEI
ZJCXCAVCQMR3
Solicitation number
SBIR_22_P2
Topic code
S13

Research abstract

The proposed innovation is to adapt Opterusrsquo; high strain composite boom and deployer technologies and apply the low-mass, low-power dust tolerant technology to robotic arms for low-gravity environments. A boom enabled robotic arm enables surface sampling, mobility, and manipulation in an extremely compact, low mass sub system. The high structural performance and low mass features of Opterusrsquo; booms and deployment mechanisms can support a greater range of end effectors for scooping, drilling, grasping, or otherwise acquiring samples or manipulating surface objects. Opterus is also investigating continuous roll-to-roll fabrication methodsnbsp;for kilometer scale HSC booms.The objective of the proposed work is to fabricate prototype boom deployer mechanisms and experimentally demonstrate the technical feasibility of high strain composite booms applied to a variety of robotic mobility, manipulation, and sampling tasks through laboratory testing and ground demonstrations.Opterus will employ an iterative development approach using the analysis, design, build, test cycle. In the course of HSC development programs, we have found a balance between build and analysis to be most effective and we expect to achieve 3-5 cycles in this program. New HSC booms often require 10-20 build iterations to achieve desired objectives. Development will be accelerated here because of Opterusrsquo; extensive experience with high strain composite booms.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

36 SBIR/STTR records share this UEI (2018–2025). Reported award amounts total $14,282,580. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.