SBIR/STTR Research Award

ALLVAR Alloys for Athermalizing SiC Telescopes with Reduced SWAP-C

Award identifier 4655980f7ec6633650a3a8831d3713a77545c906d06eeb2b4ef802115a6e068aAwarding agency Department of Defense · Missile Defense Agency

Award amount

$1,470,389

Program and phase

SBIR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Missile Defense Agency
Recipient company
Thermal Expansion Solutions, Inc.
Proposal award date
2023-04-21
Contract end date
2025-04-20
UEI
JDMKJN2L1G17
Solicitation number
21.2
Topic code
MDA21-001

Research abstract

The Ultimate Goal of these research efforts is to develop ALLVAR Alloy athermalizing strut components that enable size, weight, cost, lead time, and performance enhancements of SiC mirrored optical seekers that must withstand extreme exo-atmosphere, endo-atmosphere, and mechanical loading environments. ALLVAR Alloys offer a brand-new strong and ductile support structure solution that can offer lower cost and lead time compared to legacy seeker telescopes, when combined SiC mirrors. The Phase I project modified the thermal expansion coefficient of ALLVAR’s commercially available Alloy 30 to reach the shortened lead time goal. This proposed Phase II project will buy down the risk associated with implementing this new alloy into seeker applications by collecting necessary material property data and beginning an incremental and iterative design, analysis, build, and test plan that includes thermal, shock, vibration, radiation, and optic performance testing. ALLVAR’s collaboration with Raytheon and Quartus Engineering, subcontractors on the project, identified 1) the acquisition of micro-creep, micro- yield, and basic material properties and 2) the design, building, and testing of an ALLVAR Alloy athermalized SiC primary mirror assembly under random vibration as the most important and highest risk elements to address in an incremental test plan. This Phase II project aims to address these highest risk next steps with the following Key Objectives: 1) Close quality and material property knowledge gaps for mirror holding, interfaces, and long-term stability of ALLVAR Alloys, 2) Design a multi-mirrored SiC telescope athermalized with ALLVAR Alloys, and 3) Fabricate and evaluate the performance of the telescope’s primary mirror mount in random vibration environmental conditions. This project includes thermal and vibration analysis of a multi-mirror system and vibration testing of a primary mirror assembly. If successful, this Phase II effort will provide a foundation for executing this test plan in future efforts with the aid and guidance of MDA and Raytheon. Approved for Public Release | 22-MDA-11340 (16 Dec 22)

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

11 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $4,742,592. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.