SBIR/STTR Research Award

STTR Phase I:Enhancing wind-energy industry competitiveness using self-powered blade monitoring sensors

Award identifier 8f0f2d49600991fefcc6bd9e507ac3dcfb6a3dcef5144f108a536bd1f4856b1eAwarding agency National Science Foundation

Award amount

$256,000

Program and phase

STTR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
ActiveCharge LLC
Proposal award date
2022-10-01
Contract end date
2023-09-30
UEI
KY1QMG9XBHZ9
Solicitation number
NSF 21-563
Topic code
ET

Research abstract

The broader impact/commercial potential of this Small Business Technology Transfer (STTR) project seeks to provide an integrated monitoring solution for wind turbine blades. Continuous and reliable monitoring within the blade has been a challenge, primarily due to the lack of reliable energy for the wireless sensor (e.g., batteries need to be replaced and can be expensive and logistically difficult to replace inside the blade and power lines inside the blade are hard to install and require frequent maintenance). The proposed solution seeks to overcome current technical challenges by providing a long-lasting, maintenance-free, self-powered, integrated solution for wind turbine blade monitoring and analytics. If successfully commercialized, the solution can be deployed for autonomous sensing and smart maintenance scheduling based on big data analysis. This project may contribute to significantly and permanently reducing existing blade monitoring costs, decreasing downtime for manual monitoring and battery changesand reducing catastrophic failures with better monitoring information. By reducing the operational costs, the solution may make large-scale wind energy more competitive, reducing the world’s dependence on environmentally-harmful sources of energy. In addition, the technology may reduce the risk of injury to humans as compared to current operational processes, making wind energy safer to operate.This STTR Phase I project proposes to develop an integrated, self-powering sensor node for wind turbine blade monitoring by overcoming the following technical hurdles: lack of reliable energy for the sensor/transmitter system deep inside the blade, logistical challenges to replacing batteries inside the blade for a large number of sensors at different intervals, and difficulites with long wire-runs inside the blade as those are hard to install and require frequent maintenance. To handle these technical hurdles, this project aims to prototype an integrated, self-powered, wireless sensor node and perform field tests. This project plans to: (1) develop a mechanism for the harvester module that reliably produces electrical voltage and power regardless of the blade rotational speed, (2) develop a power management circuit with autonomous sleep/wakeup and without impedance tracking to increase charging efficiency, and (3) perform indoor and in-field test for verification of power harvesting and data transmission performance. This technolology seeks to address the fundamental weaknesses of vibration energy harvesters while integrating various components (e.g., energy harvester, sensor, transmitter, receiver, and analytics software) for an optimized solution.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.

Technology keywords

Not reported

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.