SBIR/STTR Research Award

6 Junction Expansion to 3-5 Junction Programmable LED Solar Simulator

Award identifier 07c0d82895c4eff5e49cb295abaa4a99f768d99d0e9717801b4318a5f5ff5ad0Awarding agency Department of Defense · Air Force

Award amount

$749,658

Program and phase

SBIR · Phase II

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
ANGSTROM DESIGNS INC
Proposal award date
2022-09-09
Contract end date
2024-12-12
UEI
PFJ8LV1Q7SF8
Solicitation number
19.2
Topic code
AF192-036

Research abstract

To hide its satellites in space from bad actors, Space Force needs to make them smaller.  This goal is characterized as “target signature reduction”.  The solar panel is the largest component on the spacecraft that could be reduced.  To reduce the size of the solar panels and get the same power, new higher-efficiency solar cells need to be developed.  To get to higher efficiencies, more p-n junctions need to be added to solar cells.  The Air Force Research Laboratory is developing these higher-efficiency cells with more junctions through the Roset program, but the solar industry lacks ground test equipment to measure the advanced cells with precision and accuracy.  Angstrom Designs has developed a test system, called the “Programmable Light Emitting Diode Solar Simulator”, or pLEDss, to measure all current solar cells up to five-junctions.  Angstrom Designs has also just completed a AFRL SBIR Phase I to develop a 6-junction measurement for testing newly developed six-junction cells.  If selected, this project would advance the development of pLEDss test equipment that could provide ground truth for six-junction space solar cells, potentially enabling “target signature reduction” for Space Force.  The technical approach is to build on the existing 5-junction pLEDss system by executing a series of tasks.  Task 1 will analyze, design, manufacture and test the successful 6-junction light source research from the AFRL Phase 1 SBIR development to produce prototype 6J pLEDss LED modules.  Testing of these modules will validate the design capabilities.  Task 2 will streamline manufacturing processes so the 6J capable pLEDss systems can be manufactured at reasonable cost and timing for the Space Force industrial base.  Task 3 will expand Angstrom Designs’ existing measurement and analysis software tools to incorporate 6J functionality.  Task 4 will build and test one (1) 0.5m x 0.5m 6-junction pLEDss test system that will enable solar panel measurements of all currently available space solar cell technologies, including 6-junction cells. This proposal seeks to develop technology that the US Space Force and its prime contractors can leverage to develop state of the art space solar cell technology and further the US Space Force’s goal of target signature reduction.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

18 SBIR/STTR records share this UEI (2012–2025). Reported award amounts total $8,258,744. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.