SBIR/STTR Research Award

Design and Implementation Tools for Lunar Surface Regolith Structure Construction

Award identifier 95ab2add132752fa2576d561ba7fa664a162052738f299c782a1778cf722a33dAwarding agency National Aeronautics and Space Administration

Award amount

$149,328

Program and phase

STTR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Lunar Outpost Inc
Proposal award date
2022-07-20
Contract end date
2023-08-25
UEI
XYW2GGS9BKK5
Solicitation number
STTR_22_P1
Topic code
T7

Research abstract

To facilitate the return of humans to the moon in the next several years, consideration must be given to various types of infrastructure that will be required. Navigational features are promising for accurate and repeatable vehicle landings. Durable landing pads will be able to ensure stable landing and to prevent erosion of landing sites and sand-blasted abrasion of any nearby structures. Berms to deflect ejecta and particulate matter from landings are also of interest, as are numerous other similar structures. At a lower level, it is important to consider not only what structures are needed but which are possible, and how they will be constructed. To accomplish this, Lunar Outpost together with Masten Space Systems and Michigan Technological University propose a set of analytical tools, which will take such parameters as lander size and payload weight, and return a set of optimal structures to build as well as strategies for their construction, including layer-based geometries, compaction levels and verification, and more. Additionally, a set of construction tools (scrapers, compacters, etc.) will be recommended for use with Lunar Outpost rovers for In-Situ Resource Utilization of the present regolith for construction of infrastructure. A Concept of Operations describing the timeline, equipment, and procedures for this construction will also be developed under the scope of this proposal.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

14 SBIR/STTR records share this UEI (2018–2024). Reported award amounts total $10,455,035. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.