SBIR/STTR Research Award
Providing Reliable Power to Coastal Communities using Hybrid MHK Systems
Award amount
$199,995Program and phase
SBIR · Phase IAward year
2022Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- EMRGY INC
- Proposal award date
- 2022-06-27
- Contract end date
- 2023-03-26
- UEI
- k889kh4c8gs8
- Solicitation number
- Not reported
- Topic code
- C54-18d
Research abstract
Coastal communities share close proximity with one of the earth’s most reliable energy sources – moving
water – yet they are often plagued with costly and unreliable energy resources due to the underdeveloped
nature of commercial kinetic energy conversion. Coastal communities also face rising risks of flood,
tropical storm, and other extreme events exacerbated by climate change; the ongoing resiliency and
economic development of coastal communities will depend heavily on the ability to supply reliable and
cost effective electricity to these communities in a sustainable way. Not to be understated is the challenge
of distributing power throughout communities; despite being located near the coast, communities can span
many thousands of feet, or even miles, from the location of ocean energy generators and costs expand
greatly as distance grows.
Emrgy, Inc. will partner with subcontractors ProsumerGrid and the University of Puerto Rico Mayaguez as
well as with the end-user Puerto Rico Electric Power Authority (PREPA) to develop a Hybrid Distributed
MHK Array system that will be able to efficiently and economically provide reliable power supporting key
needs of the end-user such as grid resiliency, sustainability, and low cost generation.
The general scope of this Phase I effort will include: 1) end-user engagement to drive alignment between
the design and user needs; 2) conceptual system design, performance verification, and techno-economic
analysis; 3) Phase II Planning for deployment. A Phase II effort would include: 1) Finalization of the design;
2) Procurement and manufacturing; 3) System Deployment and Validation; 4) Operation and End-User
Handover.
Upon successful completion of Phase I, the project team will deliver the detailed design for a hybrid MHK
system that addresses the reliability and cost challenges identified by PREPA for the identified coastal
community. The design will include all hardware requirements for generating turbines scalable to 50kW,
integrated with energy storage, solar and all software controls that enable rapid power dispatch when
commanded. In Phase II, the project team will construct, deliver, and test a prototype in the community,
and based on Emrgy’s deep experience in MHK device manufacturing the team expects that the hybrid
system can achieve TRL 8 through the Phase II implementation.
Technology keywords
Not reported
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Distributed Hydropower Microgrids for Creating Energy Resiliency in Agriculture
- Upper Cook Inlet Electrofuels
- A Novel Wave-Energy Converter to Power Offshore Macroalgae
- INTEGRATED CURRENT-WAVE HYDROKINETIC ENERGY HARVESTER FOR COMMUNITY RESILIENCE AND BENEFITS TO AQUATIC FAUNA
- Renewable Ocean Thermal Energy for Low-Pressure Desalination of Seawater with Co-Production of Ammonia