Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- Air Squared, Inc.
- Proposal award date
- 2022-06-27
- Contract end date
- 2023-02-26
- UEI
- N71MUPCNM3J1
- Solicitation number
- Not reported
- Topic code
- C54-24c
Research abstract
Statement of the problem or situation that is being addressed in your application.
One obstacle for reactor scale nuclear fusion blanket and tritium fuel cycle progress is lack of a long-term solution
for forevacuum roughing vacuums and pellet injection system (PIS) mechanical pump hardware. Whereas the
international fusion consensus agrees all-metal, oil-free vacuum technology is the standard for radioactive tritium
gas handling, the state-of-the-art falls short of delivering a long-term solution for demonstrative reactor scale
electricity production at institutions including the International Thermonuclear Experimental Reactor (ITER).
Additionally, legacy pumps are currently obsolete, difficult to machine, and prohibitively expensive.
General statement of how this problem is being addressed.
From twenty years understanding the demands of tritium handling and the inadequacy of the alternative reactor scale
solutions, Air Squared would like to proposal an novel dual 75 m 3 /hr all-metal, liquid-cooled, oil- and tip seal- free,
optional dual or triple-containment scroll pump development to support fusion development on a demonstrative
reactor scale in Phase I.
What is to be done in Phase I?
Three technical objectives are targeted in Phase I:
? Objective One: Concept design 75 m 3 /hr tritium compatible pump,
? Objective Two: Complete instrumented and systems level design of the proposed 75 m 3 /hr tritium
compatible pump
? Objective Three: Final 75 m 3 /hr scroll vacuum pump design for fabrication in Phase II.
Commercial Applications and Other Benefits
Successful development of the 75 m 3 /hr tritium scroll vacuum pump will propel continued international research
across all nuclear fusion institutions. Hundreds of these all-metal pumps are estimated to be installed across the
fusion industry, but no existing pump meets the precise specifications of tritium pumping for magnetic fusion. A
successful project would meet this industry need, providing the necessary infrastructure to achieve thermonuclear
power. Further, successful development of an innovative liquid cooled design may be integrated into several existing
and future scroll technologies, increasing scroll performance, efficiency, and competitiveness. Given industry
recognition of an all-metal liquid cooled scroll roughing vacuums, tertiary market opportunities would open in the
corrosive and toxic etching processes fundamental to semiconductor microfabrication for the proposed solution.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
31 SBIR/STTR records share this UEI (2013–2023). Reported award amounts total $14,325,465. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: National Aeronautics and Space Administration, Department of Energy, Department of Defense, National Science Foundation
Agency intelligence
Department of Energy
Back to SBIR/STTR Research Awards