SBIR/STTR Research Award

Advanced Development and Testing of the SunRing Heliostat

Award identifier f6c93369ee4d6e4676bcfdb82e2c8f7e6d1c3892648a643ae249b8caedc279efAwarding agency Department of Energy

Award amount

$200,000

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
SOLAR DYNAMICS LLC
Proposal award date
2022-06-27
Contract end date
2023-03-26
UEI
SMJKHE3GA894
Solicitation number
Not reported
Topic code
C54-15f

Research abstract

The Department of Energy’s Solar Energy Technology Office has set a 2030 cost target of 5 ¢/kWh for Concentrated Solar Power (CSP) plants. The solar field represents the largest cost in a CSP tower plant (30-40% of total installed cost) with commercial heliostats having installed costs of approximately $140/m2. Solar Dynamics (SD) proposes to develop and test an advanced version of our SunRing™ heliostat that reduces its total installed and proves its bankability for commercial installations. The advanced SunRing heliostat will have an installed cost 40% lower than current commercial heliostats. Phase 1 of the project focuses on developing cost saving advances in the SunRing’s novel azimuth drive moving from a conceptual to a final design supported by physical component testing. Extended outdoor testing of the baseline SunRing will also occur providing additional experience with the overall azimuth drive design approach. Phase 1 will be followed by commercialization steps in Phase 2 where the SunRing heliostat is transitioned from a Technology Readiness Level of 5 to 7. This is accomplished with 1-year of outdoor performance testing by a USA National Laboratory. Additionally, lifetime performance testing will occur on the SunRing’s drives. The focus of Phase 2 is to de-risk the technology and provide comfort in the SunRing’s ability to perform in commercial solar projects. This is critical to gain the investment needed to deploy the SunRing at commercial scale. Our team is well suited to propose this project. SD has built and deployed the baseline SunRing heliostat. In addition, SD personnel have led development, design, and operations of some of the largest CSP power plants in the world.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

4 SBIR/STTR records share this UEI (2021–2023). Reported award amounts total $2,700,000. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.