SBIR/STTR Research Award

LiDAR-based Navigation and Mapping for Rendezvous, Proximity Operations, Docking

Award identifier 4558f92471b4f01493e795e9dd5b8c77ae17df074858cceb1e57bf1d6a6cab0eAwarding agency National Aeronautics and Space Administration

Award amount

$749,999

Program and phase

SBIR · Phase II

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
ASTROBOTIC TECHNOLOGY INC
Proposal award date
2022-06-01
Contract end date
2024-05-31
UEI
JAQ3W2MGVNV1
Solicitation number
SBIR_21_P2
Topic code
S3

Research abstract

Developing autonomous and reliable Rendezvous, Proximity Operations, and Docking (RPOD) technologies will play a key role in the ability to build and maintain infrastructure in orbit by providing autonomous satellite inspection and servicing capabilities among many other applications. Astrobotic proposes to further develop its existing LiDAR-Inertial Navigation (ALIN) software package in a Phase II contract that will target demonstrating the viability of the ALIN software package. Designed to be a modular and versatile software that leverages LiDAR Simultaneous Localization and Mapping (SLAM) to provide navigation and mapping capabilities, ALIN specifically targets applications requiring high fidelity relative navigation solutions to non-cooperative dynamic spacecraft, such as the inspection and servicing of satellites. The proposed technology provides a solution that is not reliant on traditional dependencies of vision-based solutions like fiducials or prior knowledge of geometry to perform visual template matching. This enables ALIN to be effective in non-cooperative applications and in the presence of inconvenient shadowing, or even total darkness. Additionally, the LiDAR SLAM techniques utilized by Astrobotic provide ldquo;mapsrdquo; of the observed object. These methods provide valuable three-dimensional ldquo;modelrdquo; representations of the target, which is of particular value to missions where the target body has unknown shape, as in planetary or primitive body operations, or in the satellite servicing industry. Phase II work will involve optimizing the ALIN software on a powerful path-to-flight processor platform interfaced to a high-fidelity simulator for a space-grade LiDAR under a flight software framework with the goal of eventually maturing ALIN for use on a flight program.nbsp;Astrobotic will also deliver executable ALIN software and a user guide for NASA testing and analysis.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

52 SBIR/STTR records share this UEI (2010–2025). Reported award amounts total $33,759,467. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.