SBIR/STTR Research Award

Topic 34,b.3)Helium Mass Flow Meter

Award identifier 3030e48e283c94b7c68408502e7eafde746cadc4a4cb0ee526dbf77428da1fbcAwarding agency Department of Energy

Award amount

$199,922

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
HYPERBOLOID LLC
Proposal award date
2022-02-14
Contract end date
2023-02-13
UEI
GGHRB6NUNNL3
Solicitation number
Not reported
Topic code
C53-34b

Research abstract

The Q0 of Superconducting Radio Frequency (SRF) Accelerator Cavities is a measure accelerator “health”. Increasing Q0 indicates degradation of the accelerator’s ability to work. A real time measurement of cavity Q0, not available now, will flag problems before a cavities become un-usable. A return flow, Helium Mass Flow Meter, to be developed by this SBIR in Phase I makes that measurement. The great public benefit is that DOE sponsored SRF accelerators CEBAF, LCLS, SNS and FRIB may require fewer ~$1,000,000 cryomodule refurbishments - a great savings. Hyperboloid intends to develop and demonstrate a practical, robust Helium Mass Flow Meter, jumpstarting from the successful laboratory scale work of Japanese researchers. The meter has a wire/element made of a superconducting metal that is made cold enough to “switch” to the superconducting state by heat transfer from the flowing 2 K gas flow from the cavities of a cryomodule. This “switch” is a signal that is detected more easily than the change in resistance signal of signal from a meter based on a hot wire. The electronics of the Meter continuously changes a current in a heater wire adjacent to the superconductor element. When the element is driven to “switch” back to the non-superconducting state by the increasing heat from the changing current, the tracked value of current at the “switch” point correlates with Helium Mass Flow at that time. Higher flows need more heater current to do the “switch”. Calibration of the meter’s heater current to helium flow is done in situ using known power from other heaters already adjacent to the cavities of a cryomodule. Phase I tests various configurations of the superconducting element in 2 K helium flow streams and develops the electronics to detect the change in superconducting state and a variable current source to resolve helium mass flow change of about 1/20 g/s. If funds are available, Hyperboloid will design the instrument cartridge that inserts into the return flow U-Tube of Cryomodules at JLab. Hyperboloid intends to install this meter in CEBAF in Phase II and market the meter to the remaining US labs and to labs worldwide in Phase III. Little commercial use is anticipated.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

3 SBIR/STTR records share this UEI (2019–2023). Reported award amounts total $1,125,879. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.