SBIR/STTR Research Award

Nickel Zinc Battery Improvement

Award identifier d30eec9a0b0678f16eb1646a5689a1e6bf65ee00990e3b6abbb3cf3377b76499Awarding agency Department of Defense · Navy

Award amount

$239,791

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
AESIR TECHNOLOGIES INC
Proposal award date
2021-10-20
Contract end date
2023-01-17
UEI
QQGYSH7AGMU9
Solicitation number
21.1
Topic code
N211-053

Research abstract

The overall technical objective for this proposed effort is to develop 1,000 amp-hour, minimum Ni-Zn battery concept that will achieve 75% of capacity, or better, through 200+ Navy Equivalent Charge/Discharge cycles. This will include a detailed three-dimensional design model of the cell that includes key components and design parameters critical to the performance. Examples of these components and parameters include electrode dimensions and separator design. The design package will also include projected capacity, power, and cycle life performance. This will be supported by test data generated by a series of 140 Ah cell evaluations specifically designed to include features considered for use in this large format concept. In addition, the design package will include a detailed discussion on the manufacturability of the proposed cell concept. This will involve an evaluation of the various manufacturing process steps and how they will need to change in order to accommodate the manufacturing of a large format cell as compared to the current G31 format. Æsir is proposing to exercise the Phase I Option and will develop detailed design specifications for the proposed cell concept. This will include a detailed drawing package of the cell design, including key components and manufacturing parameters. In addition, a manufacturing flow process plan for the cell concept will be developed and finalized so to be readily implemented in a subsequent Phase II. This will include documentation of processes, tooling, and fixtures on the assembly line.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.