SBIR/STTR Research Award

Foreign Object Damage: Inlet Debris Monitoring System (FOD-IDMS)

Award identifier 93bf6a87831d8a2ab24352f7da7e01b4808555add1f929bd384ac19bd4f71971Awarding agency Department of Defense · Navy

Award amount

$146,324

Program and phase

SBIR · Phase I

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
TRITON SYSTEMS, INC.
Proposal award date
2021-09-21
Contract end date
2022-03-22
UEI
DA91DUWSMSQ7
Solicitation number
21.2
Topic code
N212-105

Research abstract

In response to Navy SBIR N212-105 entitled “Zero Foreign Object Damage (FOD): Inlet Debris Monitoring System (IDMS)”, Triton proposes to develop on-wing means to quantify FOD debris location, 2D size and velocity within aircraft engine inlet ducts and “sensitivity to typical Navy/Marine Corps flight and environmental operating conditions”.  With redundant systems that increase probability of detection (Pd) and reduce probability of false alarm (Pfa), Triton’s proposed technology, consisting of COTS subsystems and components will help characterize debris entering the engine inlet.  Thus, the proposed technology reduces technology risk while providing critical feedback as to subject aircraft engine inlet ability to ingest debris and runway and apron surface conditions.  Triton will address (as stated in the solicitation): The design and build of a flight qualified prototype IDMS An established system interface and interface control document (ICD) for the IDMS Determination of which factors limit or affect its Probability of Detection (Pd) and Probability of False Alarm (Pfa) Quantification of how those factors limit or affect its Pd and Pfa A mathematical model to represent the IDMS’s Pd and Pfa as a function of IDMS configurable elements, environmental conditions, and FOD related variables. In Phase I, Triton will mature the technology’s TRL and demonstrate feasibility and basic scientific principles.  Triton will design, test and validate its IDMS technology with basic breadboard experiments.  Triton will include prototype plans to be developed in Phase II. In Phase II, Triton will further develop this breadboard system and test it in an environment representing particle speed and size consistent of a Navy/Marine Corps environment.  Triton will begin to quantify Pd and Pfa.  Thereafter, Triton will develop a prototype system (operationally representative IDMS) and increase the number of parameters considered (e.g., acoustics, vibration and aerodynamic effects).  Triton will develop this prototype to flight qualification status and further quantify Pd and Pfa under operational and  environmental conditions. In Phase III, Triton will prepare the prototype system for installation in a selected Navy/Marine Corps aircraft and SOSA.  Triton will support flight testing and work to enable retrofitting of this aircraft with Triton’s IDMS. Thereafter, Triton will work with its transition partner to bring its Zero FOD: IDMS to commercial aviation.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

927 SBIR/STTR records share this UEI (1993–2026). Reported award amounts total $388,500,403. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, Department of Homeland Security, Department of Health and Human Services, Department of Transportation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.