SBIR/STTR Research Award

Advanced Flow Control System for In-Space Electric Propulsion

Award identifier 5d509e3c22a10ff2be5623b8ae9bb5d5ee2c8a90cd15cebdf73fb057f48a2038Awarding agency National Aeronautics and Space Administration

Award amount

$754,988

Program and phase

STTR · Phase II

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
CU AEROSPACE L.L.C.
Proposal award date
2021-08-05
Contract end date
2023-08-04
UEI
X95KNGLAEMH7
Solicitation number
STTR_19_P2
Topic code
T2

Research abstract

CU Aerospace (CUA) and the Univ. of Michigan (UM) propose the continued development of the Cycle Automated Mass Flow (CAMFlow) system for reliable and well-regulated flow control. CAMFlow uses an innovative control scheme that enables stable operation using only Boolean valve states, even for the low flow rates necessary for sub-kW Hall thrusters. This methodology removes system complexity and places the onus of reliability almost entirely on valve cycle life. Throttling, open and closed-loop operation, as well as hard startup/shutdown in closed loop mode were all successfully demonstrated with the CAMFlow system with a Hall thruster at UM facilities during the Phase I effort.nbsp;nbsp;Phase II CAMFlow units will be focused towards smaller Hall-effect or gridded-ion electric propulsion systems having a flow rate in the 0 ndash; 5 mg/s range, however the technology is applicable over a larger range of flow rates for a broader commercial market. The system will be designed and fabricated with size, functionality, risk tolerance, and cost considerations appropriate for NASA Class-D missions. The Phase II effort has the dual focus of extensive reliability/performance testing and the design, assembly, acceptance testing, and delivery of a compact integrated Phase II system ready for flight integration. The successful Phase I demonstrations of stable operation at target performance levels lead to the design of the Phase II CAMFlow system test hardware, thermal modeling, production, acceptance testing, environmental validation testing, and delivery of a flight-like CAMFlow system (TRL 6) at the end of Phase II.nbsp;nbsp;CUA will also develop a brassboard Propellant Management Assembly (PMA) with a best effort goal of achieving a flight-like PMA.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

81 SBIR/STTR records share this UEI (2000–2024). Reported award amounts total $28,240,718. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense, Department of Energy, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.