SBIR/STTR Research Award

Hydrogen Pre-Cooling System for Filling Medium and Heavy-Duty Fuel Cell Vehicles

Award identifier 9b9c1bbe397b6938b7d0454a2240d92a2841e3cabe692361cfe138884ff48706Awarding agency Department of Energy

Award amount

$206,499

Program and phase

SBIR · Phase I

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
SKYHAVEN SYSTEMS, LLC
Proposal award date
2021-06-28
Contract end date
2022-03-27
UEI
YW31GV8ZEM14
Solicitation number
Not reported
Topic code
15d

Research abstract

The Department of Energy solicited advancements in pre-cooling hydrogen for medium- and heavy-duty vehicles (MD/HD). Required technical performance is a cooling capacity of 100 kW for a hydrogen flowrate of 10 kg/min. Temperature requirements for the hydrogen stream are -40 °C with -33 °C reached within 30 seconds of startup. Skyhaven Systems, LLC is developing an intermediate cold energy storage system to supplement hydrogen pre-cooling systems for MD/HD vehicles. The system will use thermal energy storage to provide increased cooling capacity to meet the fueling demands of MD/HD vehicles. This proposed Phase I program will develop a thermal energy storage system to provide supplemental cooling to commercial chiller systems for filling of MD/HD vehicles. With this intermediate energy storage system, the load from pre-cooling MD/HD vehicles will be spread over a larger period, reducing the required cooling capacity of the system. An intermediate energy storage for pre-cooling of hydrogen has commercial value in enabling hydrogen filling stations to accommodate MD/HD at reasonable filling times. In addition, it could be applied to light duty hydrogen pre-cooling to decrease the cooling capacity of the hydrogen pre- cooling systems. Integrating a thermal energy storage also reduces the environmental impact on the cooling system and provides for increased resiliency and a more levelized electrical consumption of the pre-cooling system.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

33 SBIR/STTR records share this UEI (2018–2023). Reported award amounts total $10,250,264. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, National Aeronautics and Space Administration, Department of Defense, Environmental Protection Agency, National Science Foundation, Department of Agriculture

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.