SBIR/STTR Research Award

Innovative Anchoring System for Floating Offshore Wind

Award identifier 6b85525a768390eb784564b4b60a8d98652fe95c622fe98186969bcb9546ea67Awarding agency Department of Energy

Award amount

$1,149,965

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
TRITON SYSTEMS, INC.
Proposal award date
2020-08-27
Contract end date
2022-08-26
UEI
DA91DUWSMSQ7
Solicitation number
DE-FOA-0002156
Topic code
15a

Research abstract

Capital expenditure is the greatest cost driver for offshore wind offering the greatest potential to reduce the levelized cost of energy (LCOE) and make wind energy competitive with other sources of energy. In general, mooring hardware comprises 10% of CAPEX, and 16% in tension leg platforms. With total CAPEX for a wind farm project in the billions of dollars, mooring cost is a significant opportunity, especially on the West coast of the United States, where water depths are much deeper and floating turbines are needed. In the offshore floating wind sector, traditional anchoring systems use large heavy weights, caissons, driven piles, or drag embedment anchors to achieve the high-pullout forces required for wind turbine moorings. High weights and forces ultimately convert into high costs. Additionally, the floating wind sector is contending with mooring and anchoring options that are mature, but not realistic for large wind farms. This will lead to higher than expected costs and permitting issues unless addressed. Triton is developing HAGISTM, an anchoring system, designed for offshore wind sites, economic drivers, and mass production. Our product is based on highly efficient helical anchors that will reduce LCOE. It consists of an anchor and installation tool that solves the traditional challenges with installing these anchors subsea.Lower manufacturing costs of the anchor, faster installation times, lower noise for the subsea tool over a driven pile hammer are just a few of the benefits. During the DOE Phase I and II efforts, Triton has built a pilot-scale prototype of the anchor installation tool, modeled anchor performance, and is conducting anchor testing. Work under a Phase IIB effort will increase anchor and installation tool TRL to support qualification of the anchor system for subsequent operational testing and commercialization. The objective of the Phase IIB effort is to have a favorable American Bureau of Shipping technology maturity and risk assessment in place and an action plan to address any items of concern. Triton will focus on demonstrating anchor capacity at relevant scales and load conditions and collecting test data that will convince stakeholders that HAGIS is ready for an offshore test. Triton Systems and its partners have shown reduction in both anchor fabrication and installation, 25-50% and 10-30% respectively. These initial costs savings will provide the a lower LCOE costs for floating offshore wind energy. Given the unique sea/market conditions in the US initial market: the North Atlantic (Gulf of Maine) and the Pacific (offshore West Coast), Triton’s technology will offer flexible alternatives that meet the local needs on both coasts as a key element of a successful market adoption.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

927 SBIR/STTR records share this UEI (1993–2026). Reported award amounts total $388,500,403. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, Department of Homeland Security, Department of Health and Human Services, Department of Transportation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.