SBIR/STTR Research Award

Additive Manufactured RF Load for ITER

Award identifier 08a45924acc300137e45de143ca1b6fde36ca2606008d8b10006c04de2ff2e6bAwarding agency Department of Energy

Award amount

$827,930

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
CALABAZAS CREEK RESEARCH, INC.
Proposal award date
2020-08-24
Contract end date
2022-08-23
UEI
M3LBSJNCR1Z5
Solicitation number
DE-FOA-0002156
Topic code
24b

Research abstract

High power RF loads are required to dissipate the power from gyrotrons used for heating fusion plasmas. The ITER facility, under construction in France, will require twenty four loads in its initial phase with an additional twenty four required for a future upgrade. High power RF loads are also required at other facilities under construction or planned. The current cost is very high due to the complex and rigorous performance specifications. Calabazas Creek Research Inc. (CCR) is applying additive manufacturing to dramatically reduce the cost of RF loads. CCR confirmed with the ITER office that material and performance specifications could be achieved using carbon fiber printed components. Test components were built (printed) and tested. The input coupler was redesigned to reduce reflected power, compatible with 3D printed components. The Phase I program determined that load cost could be reduced by approximately $90K while reducing weight by more than 400 pounds. The number of parts were reduced by more than half, and lead time for major components were reduced from months to days. Simulations indicate that the load will dissipate 1.5 MW CW of RF power with less than 0.25% reflected. These values significantly exceed ITER specifications. Additive manufactured (3D printed) component designs will be finalized, and conventional components optimized for cost and performance. A prototype, 1.5 MW CW RF load will be built and tested at high power. ITER will require a total of forty-eight RF loads. Loads will also be required for facilities under construction or planned in China, Korea, Japan, Europe, India, and the United States.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

138 SBIR/STTR records share this UEI (1995–2024). Reported award amounts total $43,761,170. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.