SBIR/STTR Research Award

Through Thickness Reinforcement of Tubular and Conical Preforms for Hot Structure Applications

Award identifier 632fe179ffef7bbde9adbd9fa7db55275f5a5fcc8685578fcc33d46d81dc04c9Awarding agency National Aeronautics and Space Administration

Award amount

$124,357

Program and phase

SBIR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
T.E.A.M INC
Proposal award date
2020-08-12
Contract end date
2021-03-01
UEI
K3YDRL61JDU1
Solicitation number
SBIR_20_P1
Topic code
H5

Research abstract

C-C material systems have high strength:weight ratios at high temperatures, making them well suited for future hot structure designs.nbsp; However legacy C-C solutions are subject to poor through thickness propertiesnbsp;(for 2D laminates), or manufacturing speed and capacity issuesnbsp;(for Cartesian billets.)nbsp; These issues are often compounded for tubular or conical geometries.nbsp;nbsp;nbsp;With this SBIR Phase I submission TEAM, Inc. proposes to advance the state art for tubular and conical preforming methods for use innbsp;C-Cnbsp;hot structure applications.nbsp; A parallel process development and testing program is proposed:nbsp;nbsp;Process Development:nbsp; We will use ldquo;off the shelfrdquo; and versatile braiding technology to demonstrate fabrication of conical, carbon fiber preform(s) with up to 1rdquo; wall thickness and conical geometry. nbsp;We will modify TEAM#39;snbsp;custom designed, automated z-stitching line to insert stitches into a conical geometry preform at controlled and repeatable spacing(s).nbsp;nbsp;Testing Program:In parallel with the process development, we will quickly fabricate flat panel test coupons of stitched and un-stitched braided laminates. (A phenolic-resin system will be used to meet cost and schedule constraints in Phase I.)nbsp; ~Half the panels will be tested by partner Southern Research Institute to characterize in-plane and inter-laminar tensilenbsp;properties of stitched vs. un-stitched variants.nbsp; The other ~half of panels will be delivered as-is for potential C-C densification and testing by NASA or by TEAM at beginning of Phase II.nbsp;nbsp;The advantage of the proposed approach is that both the braiding process and the stitching work cell are easily scalednbsp;in terms of part size and geometry.nbsp; Through thickness propertynbsp;issues with traditional C-C tape-lay are addressed by the proposed stitching process.nbsp; Cost / capacity / geometric constraint issues associated with Cartesian / Polar billets are addressed by versatility and relative speed of the braiding and z-stitching processes.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

9 SBIR/STTR records share this UEI (2014–2022). Reported award amounts total $2,487,416. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.