SBIR/STTR Research Award

Cryocooler Exported Vibration Reduction Subsystem (CEVRS)

Award identifier 2e62a759a2bd02dd9d1e4e675452a2597ac95984261b5169dfe5cf7b9a1709cbAwarding agency National Aeronautics and Space Administration

Award amount

$124,684

Program and phase

SBIR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
WECOSO, INC.
Proposal award date
2020-08-07
Contract end date
2021-03-01
UEI
JMRJNYURJ9F6
Solicitation number
SBIR_20_P1
Topic code
S1

Research abstract

The Origins Space Telescope (OST) requires cryocooler exported vibration of less than 100 mN, which will be challenging to achieve with current technologies given the expected 500 mN to 1N exported force amplitude in the uncompensated cryocooler cross axes. The baseline Lynx design recognizes this challenge, presently assuming that a mechanical isolation structure and a long transfer line between the cryocooler compressor and cold head will provide the necessary vibration isolation for the microcalorimeter instrument. This approach carries structural design risk and necessitates a complicated, custom, unproven cryocooler integration scheme.nbsp;West Coast Solutions (WCS) and teammate Lockheed Martin Space (LM Space) propose to develop an active Cryocooler Exported Vibration Reduction System (CEVRS) for use with mechanical cryocoolers to reduce the jitter exported to the optical instrument and to simplify the cryocooler integration. Our target applications are sensitive space instruments in general, and the Origins Space Telescope (OST) and Lynx missions in particular. WCS will perform a trade study to downselect between an Electromechanical Cancellation system and a Piezoelectric Isolation system. In parallel and in close coordination with LM Space, WCS will develop the concept designs for the LM Mega Compressor to inform how it, and similar compressors, can be integrated into payloads such as Lynx and OST utilizing CEVRS to achieve the target low vibration. Finally, the Phase II demonstration system and proposed test protocol will be defined.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

25 SBIR/STTR records share this UEI (2016–2025). Reported award amounts total $15,944,480. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.