SBIR/STTR Research Award

Metal Additive Manufacturing to Build and Repair High-Value Copper Components

Award identifier 513e1e9ae9c51d0663a7aff6f31fe437b73e25b285b3a79abc64d3bbe1d9e313Awarding agency Department of Defense · Air Force

Award amount

$997,849

Program and phase

SBIR · Phase II – Direct to Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
FORMALLOY TECHNOLOGIES INC
Proposal award date
2020-07-14
Contract end date
2021-10-14
UEI
YVDGJME44G71
Solicitation number
X20.R
Topic code
AF20R-DCSO1

Research abstract

New innovations in metal additive manufacturing enable high-value components to be manufactured, repaired and prototyped quickly and cost-effectively. Arc heaters utilized by The US Air Force Hypersonic Test & Evaluation Technologies group at Arnold Engineering Development Complex (AEDC) is an example of a key asset with high-value components which are used to provide simulated test conditions and environments for a variety of vehicles. The hpersonic technology studied at the Air Force Base in Tennessee can reach incredibly high speeds, and the testing environment experiences extremely high turbulence, pressures, temperatures, and thin shock layers. These harsh arc heater conditions degrade high-value components such as electrodes and segments rapidly, both of which are primarily copper based. These current components are sole sourced, have lengthy lead times, and have unpredictable usage rates. By adapting the latest directed energy deposition (DED) technology, repairing and building these copper components can enable a return to service in a matter of days and with significant cost savings. Formalloy Technologies, Inc.'s Direct to Phase II proposal will design, manufacture, and deliver an initial system capable of repairing the damaged electrodes and segments of the arc heater, including worn areas within the inner diameter. The initial tailored system will be delivered to the customer's site by the end of the proposal and training will be provided to allow the end users at AEDC to efficiently repair an initial set of components and resume testing at their facility.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

5 SBIR/STTR records share this UEI (2020–2025). Reported award amounts total $3,139,563. Reported amounts are not federal obligations.

Phases: Phase I, Phase II – Direct to Phase II, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.