SBIR/STTR Research Award

Compact, Lightweight Bolt-on Deorbit Device for Spacecraft

Award identifier 2723d5b8d6f6d326c57c9ca45085c406b7fa5c4f0717d1c3a8197a2e40ce926fAwarding agency National Aeronautics and Space Administration

Award amount

$749,752

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
L'GARDE, INC.
Proposal award date
2020-06-19
Contract end date
2022-06-18
UEI
LEUWTPVHDXA8
Solicitation number
SBIR_19_P2
Topic code
Z8

Research abstract

Two simple bolt-on de-orbit device configurations developed during Phase I will be carried to the CDR level for Phase II culminating in a ready-to-fly de-orbiter at the end of the project.nbsp; The first is a passive de-orbiter suitable for use at altitudes up to 1200 km where no vane sail articulation is needed. For altitudes above 1200 km our analysis showed that in order to decay within the 25-year quot;requirementquot; an articulating vane sail type de-orbiter is needed for rough-pointing against solar pressure.nbsp; Even if the vane sail of the de-orbiter is mis-pointed by 45 degrees, it will still see about 70 percent solar pressure drag. For these higher altitudes anbsp;passively articulating bolt-on de-orbit device based on two-way shape memory alloy is used. The two-way shape memory alloy unfurls to a large area against solar pressure during the sun-side of the orbit when it is warmed, and when its quot;back is turned against the sunquot; on its way to the eclipse side of the orbit, it cools down and folds back to a low area device decreasing the solar pressure on it as it exits the sun side.nbsp; The de-orbiter area can be tailored such that after it crosses the 1200 km limit on its way down, the active area against the atmosphere is still sufficient for de-orbiting within 25 years.nbsp; The SMA based de-orbiter has no need for motors or sources of power and the mass and stowed volume gained can be used for an increase in the amount of material to package making it suitable for both altitude regimes.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

67 SBIR/STTR records share this UEI (1983–2025). Reported award amounts total $21,901,140. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, Department of Commerce

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.