Development of a Low Maintenance Composite Tower to Replace the AB-1368 Tower
Award amount
$2,798,000Program and phase
SBIR · Phase IIAward year
2020Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- EBERT COMPOSITES CORPORATION
- Proposal award date
- 2020-06-08
- Contract end date
- 2022-06-08
- UEI
- RBMKLFLCH6M8
- Solicitation number
- N/A
- Topic code
- AF06-341
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Development and Evaluation of Non-Delaminating Low Maintenance Radome Technology
- Rapid Assembly of Durable Composite Radome Panels Using Low-Cost Snap-Lock Connection Technology
- Hydrophobic/Non-Delaminating Radome Material
- Tapered Composite Wind Turbine Tower Utilizing CNC-Machined Pultruded Lineals
- Tapered Composite Wind Turbine Tower Utilizing CNC-Machined Pultruded Lineals
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
12 SBIR/STTR records share this UEI (1998–2020). Reported award amounts total $8,306,441. Reported amounts are not federal obligations.
Phases: Phase II, Phase I
Agencies: Department of Defense, Department of Transportation, Department of Energy