SBIR/STTR Research Award

PLAID: PATTERN LAYOUT VIA AUGMENTED REALITY BASED INTERACTIVE DIALOG

Award identifier 8d13df8717ce3d7982efe385755d0d5f4beb925803af30ce4e1c5d43e87f250bAwarding agency Department of Defense · Navy

Award amount

$140,000

Program and phase

SBIR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
Materials Technologies Corporation
Proposal award date
2020-05-29
Contract end date
2020-11-30
UEI
MC9CPJ8DFPE3
Solicitation number
00.1
Topic code
N201-008

Research abstract

The wiring infrastructure inside an in-service aircraft (and ship and sub alike) – is a confluence of three realities: (i) As-designed layout, (ii) As-built variant, and (iii) As-it is after inspection, maintenance, repair, and overhaul (IMRO). These realities lead to two actions: (a) Start of Information Forward Flow Deviation (IFFD):  During aircraft assembly, the harness installers take a “practical” approach in deviating from the drawings in the interest of production time and cost. Once put in service, the maintainers are under pressure to complete the ad-hoc maintenance action most expediently and at the least cost to minimize Aircraft on the Ground (AoG) time;  they simply cannot afford to be slowed down for the tedious task of reviewing the as-designed or as-built layout; and (b) Absence of Information Backward Flow (IBFA): Once the aircraft is returned to the flight line, they swiftly move to the next aircraft; the repair data from the inspection and maintenance just completed does not get transmitted upstream so neither the assembly line nor the design engineers can benefit from the in-service reality. Far worse, with no information backflow, today’s maintainer has no ability to review any of the past maintenance action. Moreover, without the field data communicated back upstream, the assembly line cannot modify its installation procedures, nor can the design engineers improve their “to build” design drawings.  Bottom Line: Reduced Readiness and increased Lifecycle Ownership Cost (LOC) – both against Navy’s mission. For wiring maintenance, the current method to ID a wire is archaic. Maintainers use bare eyes, often with a dental mirror + a flashlight, to ID the markings on the installed wiring in the aircraft. More often than not, the task forces the maintainer to work in ergonomically challenging postures, hence a heightened risk of physical injury. It takes more than 2 minutes per wire just to read the wire ID, and that too, with 8 to 12% error because the process is based on subjective human ability to read the wire ID with naked eyes or a magnifier. Then an additional 2-3 minutes to manually look up the database (often on paper) to identify the wire, its connectors and pin outs at the two ends. In total, this physically challenging manual task may take over 5 minutes per wire. With thousands of wires, harnesses, connectors etc., the cost incurred just for wire infrastructure maintenance is enormous. We now propose to integrate our NUVU and WIN (both TRL > 6) and AR/MR capabilities to create PLAID…an interactive AR toolset that would employ pattern layout capability to analyze the health of an aircraft’s wiring infrastructure in its field of view.  When fully implemented (end of Phase II), PLAID will become an affordable AR toolset using pattern recognition and providing intuitive visual overlays of complex wiring installations, routings, and clamp and abatement placements in relation to surrounding components and structure.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

48 SBIR/STTR records share this UEI (1988–2022). Reported award amounts total $11,941,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.