SBIR/STTR Research Award

Low Cost, Multilayer Capacitors Based on Novel Nanocomposite Dielectric

Award identifier d4d7b3b6bffa24a2f9051f4673d45be31d33aec759ada5dc8f33639b8dd35f8aAwarding agency Department of Defense · Army

Award amount

$1,099,993

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
TPL, INC
Proposal award date
2020-03-10
Contract end date
2022-09-22
UEI
ZC4PPSM47QQ3
Solicitation number
15.1
Topic code
A15-014

Research abstract

Multi-point initiators used in modern explosive projectiles rely on high voltage capacitors which can deliver high power in a low inductance configuration. Current capacitors meeting the required performance specifications are based on dielectric ceramics in multi-layer configurations. These capacitors cost as much as as $100 and have a volume of over 400 mm3. Consequently, the use of multi-point initiators for many munition applications is limited by size and cost of these capacitors. In response to this need, TPL proposes continued development of a revolutionary capacitor technology based on high energy density polymer-nanoparticle dielectrics. Phase I development was successful in defining a materials and designs which offer over a factor of two increase in capacitor energy density. The Phase II was successful in demonstrating capabilities for incorporating these materials and designs into production processes which allow for low cost manufacturing. A transition path and partner has been defined for producing significantly smaller capacitors for multi-point initiators at a fraction of the cost, <$5.00 per unit in high volume. While all production processes have been defined and demonstrated, the proposed sequential Phase II will focus on completing the design and manufacturing optimization and transition to full-scale production. Specific focus will be directed at addressing identified voltage limitations, establishing statistically reliable performance and ensuring production cost targets are met. A series of capacitor design, fabrication and evaluation iterations are planned and will culminate in a production demonstration with deliverables

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

220 SBIR/STTR records share this UEI (1984–2022). Reported award amounts total $49,867,963. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, National Aeronautics and Space Administration, Department of Health and Human Services, Nuclear Regulatory Commission

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.