Stable High Bandwidth AO Control with physical DM constraints
Award amount
$749,979Program and phase
STTR · Phase IIAward year
2020Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- Guidestar Optical Systems, Inc.
- Proposal award date
- 2019-10-07
- Contract end date
- 2021-10-07
- UEI
- G3SFMLACX364
- Solicitation number
- 18.A
- Topic code
- AF18A-T008
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Analysis and prediction of FSO coverage within the battlespace (FSO-PLAN)
- Fine Tracking and Aimpoint Maintenance for Phased Array High Energy Lasers
- Optical Turbulence Forecast Technology
- Fast-framing SWIR cameras for digital-holographic detection
- Vibration imaging for the characterization of extended, non-cooperative targets
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
16 SBIR/STTR records share this UEI (2016–2020). Reported award amounts total $5,487,533. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense