SBIR/STTR Research Award
Advanced DACS Tanks
Award amount
$999,552Program and phase
SBIR · Phase IIAward year
2019Award details
- Awarding agency
- Department of Defense
- Branch
- Missile Defense Agency
- Recipient company
- GLOYER-TAYLOR LABORATORIES INC
- Proposal award date
- 2019-09-25
- Contract end date
- 2021-09-24
- UEI
- RPLDKCP343S9
- Solicitation number
- 18.1
- Topic code
- MDA18-008
Research abstract
In the Phase I effort, GTL showed that future missile interceptor performance can be substantially increased by the combination of an innovative configuration and a breakthrough composite tank technology. The Phase II effort will include material characterization testing and the fabrication and testing of multiple small-scale tanks. Based on those results, GTL will design, analyze, fabricate and test a proof-of-concept advanced propellant tank that is sized for missile interceptors. Approved for Public Release 19-MDA-10203 (4 Sep 19)
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Compact Neon Recovery, Purification, and Liquefaction System
- Structural Sensors for Health Monitoring
- High Temperature RF Cables Phase II
- Additively Produced Telescope Mirrors Phase II
- Rotating Detonation Rocket Engine
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Lightweight Multifunctional Components for Next-Gen Kill Vehicles (1000-498)
- Innovative, Multi-Functional Kill Vehicle Primary Structures via 3D and Additive Manufacturing
- Compact Modular DACS
- Structurally-Integrated, Multifunctional Components for Next-Gen Kill Vehicles (1000-445)