SBIR/STTR Research Award

SBIR Phase I: Enhanced Water Recovery at the Energy-Water Nexus: Towards Water-Efficient Cooling Systems

Award identifier f19b68d5319d8bd7ec490c9117061ed27430eef74d5bb42ff5097856844f5ee5Awarding agency National Science Foundation

Award amount

$225,000

Program and phase

SBIR · Phase I

Award year

2019

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
Infinite Cooling Inc.
Proposal award date
2019-07-01
Contract end date
2019-12-31
UEI
DQ6XANMF1RC5
Solicitation number
Not reported
Topic code
CT

Research abstract

The broader impact and commercial potential of this Small Business Innovation Research (SBIR) project is technology that can provide a transformational reduction in how much freshwater power plants and industrial processes utilize for their cooling needs. One of the US's largest water withdrawal uses is power plants, which account for 39% of total US freshwater withdrawals, mostly for cooling. Cooling towers account for most of the water consumption of the power industry (~1 trillion gallons per year). The product addresses this problem by capturing water from cooling tower plumes so that the water can be re-used. This enables reduction of consumption of water drawn by the power plant (through re-use) by 20%, which means large cost savings to the plants themselves and large savings of water for the community they operate in, allowing that water to be utilized for other important uses. This SBIR Phase I project proposes to develop a commercial proof-of-concept of water capture technology for cooling towers used in power plants and industrial processes. The novel technology uses electric fields to ionize the air around a cooling tower outlet, charge the escaping water leaving cooling towers and direct the water toward a mesh-based collector, where it collects and drips toward a collection tank on the periphery of the cooling tower. Throughout Phase I of the SBIR, the research will focus on verifying the quantity of collectable water droplets in the plumes of the cooling towers, developing durable electrode and collector designs that meet both our performance and stability requirements, and analyzing the collected water quality. Discussions with initial customers have set quantitative success metrics for each of the aforementioned aspects of the Phase I research. This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

3 SBIR/STTR records share this UEI (2019–2022). Reported award amounts total $1,324,908. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Science Foundation, Environmental Protection Agency

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.