SBIR/STTR Research Award

High Efficiency, Advanced Cycle, Multi-ITB, Turbo Shaft Engine for Advanced Propulsion, Multi-Mode Operation with Power On Demand Capability

Award identifier d7246ab9334c5690b2fbc43b17bf009a5be4032c7bb19a3b0c6103ae0ffa1246Awarding agency Department of Defense · Army

Award amount

$999,682

Program and phase

SBIR · Phase II

Award year

2019

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
SPYTEK AEROSPACE CORP
Proposal award date
2018-11-05
Contract end date
2020-11-05
UEI
KD6VWJ8MHRX5
Solicitation number
17.1
Topic code
A17-032

Research abstract

Spytek Aerospace proposes in Phase II to build advanced dual Inter Turbine Burner (ITB) turbo-shaft engine to create a modular multi-mode adaptive advanced cycle gas turbine engine for Vertical Take-Off and Landing (VTOL) aircraft/Unmanned Aerial Vehicles (UAVs) use based on several Aurora Flight Sciences (AFS) notional vehicles . In Phase I Spytek conducted vehicle studies with AFS, established the engine size at 400-556 hp, designated TI310-SA100, and did significant engine cycle work to define performance capability. Using Spytek’s operating FI304-SA325 dual ITB turbo-fan of similar architecture, a detailed engine layout, including individual component detail and manufacturing detail was provided. The proposed, dual output shaft engine will use the multi-ITB platform, and be capable of hybrid electric operations. Spytek will also develop a low cost/size/weight 250 kW generator to be integrated with the TI310 Turboshaft working with MotorSolver as the generator design/manufacture source. Spytek demonstrated the feasibility of an innovative approach for advanced power and propulsion concepts through modeling, empirical and pragmatic analysis. The analysis included the effects or requirements driven by vehicle subsystems, payloads and all other ancillary components of the power and propulsion system. TRL level of the proposed engine at completion of Phase II is 6-7.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

15 SBIR/STTR records share this UEI (2007–2022). Reported award amounts total $6,009,727. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.