Response deadline
Thu, Jun 25, 2026, 8:00 PM EDTFXSB 26-6837 Repair Replace Hangar Roof B11525
NAICS code
NAICS 238160Compare your company's capabilities against this federal opportunity using CaptureIQ.
Opportunity details
- NAICS
- 238160
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- SBA
- Original posted
- Unavailable
- Last updated
- October 18, 2026
- Notice ID
- 83d6580edfa149a48e0acf4065ed06a4
Summary
Site visit is scheduled for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Read Full Official Summary
Site visit is scheduled for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Related Federal Opportunities
Why this matters
- This notice is a combined synopsis/solicitation.
- The response deadline is 6 days away.
- 4 related opportunities share this NAICS.
Related federal terms
- NAICS — North American Industry Classification System
Market context
4 Related OpportunitiesMatching opportunities on RFPCapture