SBIR/STTR Research Award

Devices and Methods for De-Energizing a Photovoltaic System

Award identifier 8893b0070f40aa00bd987b5ec6fab6a57b5479ca3c171f6adf3aed1b393d3c64Awarding agency Department of Energy

Award amount

$149,997

Program and phase

SBIR · Phase I

Award year

2018

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
INNOSYS, INC.
Proposal award date
2018-07-02
Contract end date
2019-04-01
UEI
SKSZV1JCCLJ7
Solicitation number
DE-FOA-0001771
Topic code
12a

Research abstract

The 2017 changes to §690.12 of the National Electrical Code (NEC) require that all photovoltaic (PV) systems installed in or on buildings to include a ‘rapid shutdown’ mechanism which reduces the voltage within 1 inch of an installed module to less than 80V within 30 seconds of rapid shutdown initiation. Currently this requirement is challenging to achieve in a cost-effective manner. The National Renewable Energy Laboratory (NREL) has invented a prototype device which quickly and reliably de-energizes PV modules in compliance with §690. As part of this Technology Transfer Opportunity, we shall build on the work done by NREL to achieve a solution and product family that meets or exceeds the NEC 2017 §690.12 requirements. As part of the Phase I SBIR, InnoSys proposes to collaborate and partner with NREL and Christopher Alan, the inventor of the de-energizer technology and developer of the breadboard single de-energizer module prototype. In Phase I, InnoSys shall perform best practice to redesign and scale this benchtop prototype to larger system voltages (i.e., from less than 100 Volts up to 1000 Volts) and higher currents (i.e., up to 10 amps per PV module) and provide higher levels of detection, protection, operation, fault tolerance, communications for the modules/systems/networks. We shall construct a Phase I Proof-of-Concept and also perform comprehensive testing of the Phase I Proof- of-Concept 1000 Volt modules and laboratory scale system. We shall finalize the specifications and requirements for Phase II and provide a Phase I Final Report and a Phase II roadmap to subsequently commercialize and deliver products in Phase II that simplify compliance with the 2017 NEC.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

73 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $33,892,460. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.