SBIR/STTR Research Award

High Gradient High Shunt Impedance Accelerating Structure

Award identifier 064e0bed9a871c013bd5caf97757ae160983851bbec0605ed82561714e85d7a7Awarding agency Department of Energy

Award amount

$148,268

Program and phase

SBIR · Phase I

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2017-06-12
Contract end date
2018-03-11
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0001619
Topic code
23a

Research abstract

Conventional traveling wave or pi-phase advance standing wave structures use coupling of the microwave power through the beam pipe. This feature constrains the cavity shunt impedance (efficiency) to relatively small values. As microwave power flows through the accelerating cells in such structures, the probability of breakdown in high gradient operation is greatly increased. Euclid Techlabs LLC proposes to develop a high gradient high efficiency accelerating structure based on a distributed microwave coupling approach invented at SLAC. These structures include one or more parallel waveguides which are loaded by accelerating cavities. In this configuration accelerating cavities are fed independently and completely isolated at the beam pipe. This approach allows maximizing the shunt impedance and enables high gradient operation because there is no microwave power flowing through the accelerating cavity. In Phase I we will design and build a proof-of-principle prototype of a distributed coupling accelerating structure. The only step left to Phase II because of limited time in Phase I will be the brazing of the structure. We will perform cold tests of the unbrazed structure to measure its basic accelerating properties. The main performance metric in Phase I is the demonstration of high shunt impedance (~100 MOhm/m). Future free electron lasers and colliders require high gradient and high efficiency accelerating structures. The accelerator proposed here satisfies both requirements and offers a reduced manufacturing cost compared to modern high gradient structures. The proposed approach will find immediate applications in industry because the high shunt impedance relaxes the requirements on the peak power of the microwave source for the accelerator.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.