The Electric Vehicle Battery Total Life Cycle (EVB-TLC) System for Improved Battery Management
Award amount
$1,999,972Program and phase
SBIR · Phase IIAward year
2025Award details
- Awarding agency
- Department of Defense
- Branch
- Army
- Recipient company
- R-DEX SYSTEMS, INC.
- Proposal award date
- 2025-09-10
- Contract end date
- 2027-09-26
- UEI
- HD9RM38CWBM6
- Solicitation number
- 22.4
- Topic code
- A224-016
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Comprehensive Multimodal Generative AI Platform for Digital Twins
- Multi-Observer Multi-Spectral Passive Object Detection
- Image Quality and Task Complexity for Machine Learning
- Drone Swarm Detection Using Artificial Intelligence Based on Ultrafast Neural Networks
- Wayfarer: Real-time Data Drift and Out of Distribution (OOD) Detection Package
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Hydrating the Force with Sustainable Water from Air
- Clean onsite energy from organic, biomass, and plastic waste, to reduce greenhouse gas emissions and deliver renewable energy, improved resiliency, and cost savings to the U.S. Army.
- 3D Printing Army Supplies Directly From Discarded Plastic Waste
- Containerized Photovoltaic Microgrid System for Forward Operating Environments
- Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems
Research funding history
43 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $28,725,492. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Defense, National Science Foundation, Department of Transportation