SBIR/STTR Research Award

Integrated Energetic Ion Mitigation for High Power Plasma Cathodes

Award identifier f4728de8ea4e260447d6ae613d16e4cee9c0b55a3a83787565408d4f9c20c400Awarding agency National Aeronautics and Space Administration

Award amount

$124,978

Program and phase

SBIR · Phase I

Award year

2015

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Electrodynamic Applications Inc
Proposal award date
2015-06-17
Contract end date
2015-12-17
UEI
EKN4D4FDZNV9
Solicitation number
Not reported
Topic code
H2.03

Research abstract

The innovation proposed is a hollow cathode that integrates mitigation methods to suppress wear to the keeper. Recent advances in the magnetic topology in Hall thrusters has eliminated erosion of the thruster walls. As such the life limiting component of Hall thrusters has shifted to the cathode lifetime. Under a previous investigation aimed at understanding the impact of high energy ions in high current hollow cathodes, we mapped the energy spectra of cathode derived ions for both a barium oxide hollow cathode and a LaB6 hollow cathode. Energetic ions were clearly present and their intensity and peak energy tended to increase with increasing discharge current. Preliminary mitigations experiments showed promise in the use of an externally applied magnetic field as a way to reduce the peak energy of the emitted ion flux. The overall goal of this proposal is to produce a hollow cathode with integrated energetic ion mitigation technology. This cathode will be tested in magnetic field environments characteristic of Hall and gridded ion engines. It will provide a good body of experimental evidence of how to successfully mitigate cathode erosion for the high powered thrusters currently under development. Additionally, an energetic ion mitigation method could be directly integrated into the cathode design for the recently proposed Asteroid Retrieval Mission (ARM) which is currently baselined to use 4-5 10 kW class magnetically shielded Hall thrusters.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

29 SBIR/STTR records share this UEI (2003–2015). Reported award amounts total $7,439,985. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.