SBIR/STTR Research Award

Staging for Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

Award identifier 95408e0ee18339bf091482e36bf5ce45321e0385cd18f9a0cdb0200257156daeAwarding agency Department of Energy

Award amount

$999,758

Program and phase

SBIR · Phase II

Award year

2015

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2015-04-06
Contract end date
2017-04-05
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0001193
Topic code
30a

Research abstract

Linear colliders based on two-beam wakefield acceleration have an intrinsically modular design. A fundamental requirement of two-beam wakefield acceleration that has yet to be demonstrated is the staging of sequential accelerating modules. For a successful staging demonstration two key things have to be addressed: drive beam separation and the timing between the accelerated beam and wakes from different stages. Previous methods addressed the timing issue by sending the drive beam through a 180 degree bend, but this leads to problems with coherent synchrotron radiation and subsequent degradation of beam quality. We propose to use a fast stripline kicker for drive bunch train management. We estimate that the power requirement and turn-on time are well within a grasp of current technology. Synchronization of the main (witness) beam with wakefields generated by the drive beam can be done by a series of variable microwave power delay lines, which eliminates the need to bend the drive beam. We propose to use an overmoded TE01 mode based cylindrical waveguide as a delay line because of the reduced power loss of this mode. In the Phase I project, we have designed and built all necessary hardware to setup and demonstrate a major component of the staging process. Starting with initial staging experiment early in the Phase II work, we will demonstrate the entire staging process by the end of the project. Commercial Applications and Other Benefits: Staging is a key experiment that has to be demonstrated for the validation of the wakefield collider concept. If the main (witness) beam can be made synchronous with the drive beam wakefield generated in separate stages, and preservation of the main beam emittance can be shown, then a collider at a given energy can be designed by just stacking together the required number of wakefield modules.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.