SBIR/STTR Research Award

Data Fusion of Eddy Current, Ultrasonic, and Radiographic Data

Award identifier 90bbb5429808ccad0a531f000fbd9ef4085c18c45d964f805c42b120c7824c74Awarding agency Department of Defense · Air Force

Award amount

$1,259,979

Program and phase

SBIR · Phase II

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
ETEGENT TECHNOLOGIES, LTD.
Proposal award date
2014-08-06
Contract end date
2016-07-31
UEI
FLKAMJTNTDY1
Solicitation number
2006.1
Topic code
AF06-079

Research abstract

ABSTRACT: The current F-35 repair CONOPS associated with any significant coating or structural damage requires the use of a trace and transfer approach to capture structural damage location, size and orientation. This is a cumbersome, time-consuming process that involves tracing damage on a large, clear piece of Mylar that is sent to Lockheed Martin (LM) engineers who"eye-ball"a mapping onto 3D models for repair design. The objective of this proposal is to develop an alternative approach a digital photograph based approach. This new approach replaces the Mylar with a digital photograph from a standard commercial camera. The photograph can be emailed from the inspectors to the structural engineers. The engineers can then easily extract the damage from the photograph and map it onto 3D models. BENEFIT: Significant reduction in time required to repair aircraft structural damage. In order for an acceptable repair to be designed, engineers spend countless hours on collecting information about the structure to be analyzed and finding information on similar repairs and analysis completed in the past for a given location. This results in engineers spending a lot of"Non-Value Added Time"just collecting the necessary information in order to process all of it. In many cases, existing information isn"t found and the analysis is completed without it. The Navy has performed time studies on the F/A-18 structural repair process and has projected that NLign will reduce the average structural engineering disposition time from 14 hours per damage to 3 hours, a 78% reduction in time. It is believed the benefits of using this technology with the F-35 program could be similar to results seen by the USN for the F/A-18. Given the reduction in engineering analysis time, the benefits will also include increased aircraft availability.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

94 SBIR/STTR records share this UEI (1997–2025). Reported award amounts total $50,147,198. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Science Foundation, Department of Energy, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.