SBIR/STTR Research Award

High Energy Density Lithium Battery System with an Integrated Low Cost Heater Sub-System for Missions on Titan.

Award identifier 48e404274a1a68eab495f8e6d27b07ed35de7ae8db39baaef9999beda0b59820Awarding agency National Aeronautics and Space Administration

Award amount

$124,874

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
AMERICAN ENERGY TECHNOLOGIES CO
Proposal award date
2014-06-20
Contract end date
2014-12-19
UEI
G9MJMWJUKJJ5
Solicitation number
Not reported
Topic code
S3.03

Research abstract

This Phase I SBIR project seeks to develop a 500 Wh/kg Lithium primary battery for intended application as the primary power source on landers and probes for future missions to Titan/Enceladus and near Earth asteroids. The proposed battery technology aims to offer a viable alternative to Li/SO2 primary batteries which were used in the most recent mission to Titan. A thorough analysis of power requirements for the Huygens-Cassini mission (2005 landing) will be undertaken from the point of view of identifying engineering areas where the benefits of introduction of a more potent battery could be realized. Developers will focus on the engineering and performance testing of two distinctly different cell designs in a 32650 cylindrical cell housing. An integral part of the new battery will be a system of smart electrical heaters which, at a fraction of available battery power, will turn resistive heaters on and off as required to compensate for heat losses through the battery box wall (the assumption of the model being studied is that the battery should not require the use of external radioactive heating sources to maintain operation). This project will see the introduction of several new materials which will be manufactured by the contractor for purposes of boosting the energy efficiency of the proposed battery system.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

26 SBIR/STTR records share this UEI (2009–2025). Reported award amounts total $15,960,970. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.