Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- MATERIALS ENGINEERING AND TECHNICAL SUPPORT SERVICES CORP.
- Proposal award date
- 2014-03-10
- Contract end date
- 2014-12-09
- UEI
- FQ1PKJZ9XME3
- Solicitation number
- 2013.1
- Topic code
- AF131-198
Research abstract
ABSTRACT: Hill AFB paint stripping operations for aircraft landing gear components is currently achieved by soaking landing gear components in a methylene chloride-based (MeCl) solution for 30 minutes, followed by plastic media blasting to remove residual paint. Their current operations use over 16,000 gallons of MeCl-based stripper each year. OSHA classifies MeCl as a potential carcinogen and regulates occupational exposures accordingly. As a consequence, the Hill AFB is seeking environmentally-friendly approaches to paint removal for aircraft landing gear components. The replacement chemistry must not contain HAPs and be at least as effective as MeCl in order to fit the current timeline for processing. Any material used for paint removal must not cause any deleterious effects to the aircraft landing gear components. In addition, since Hill AFB operates its own industrial wastewater treatment plant (IWTP), it is also imperative that the replacement technology not interfere with the waste water treatment process. This proposal addresses the MeCl-replacement requirements through a structured work plan that will leverage previously developed environmentally friendly depainting technology, significant expertise in testing and evaluation of aircraft landing gear materials, and familiarity with Hill AFB IWTP operations. The proposed program will clearly meet all of the objectives of the program and establish a solid foundation for technology transfer and implementation. BENEFIT: The results of this SBIR program will immediately address MeCl replacement requirements in Hill AFB landing gear depainting operations. Once demonstrated, the replacement technology should be adaptable to other DoD depainting operations, as well as parallel processes used in the commercial aircraft industry. Other applications include automotive and other industrial painting"re-work"operations where parts require repainting due to initial quality issues, as well as possible adaptation to cleaning equipment and facilities used in painting operations.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
143 SBIR/STTR records share this UEI (1995–2025). Reported award amounts total $47,752,514. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, Environmental Protection Agency, Department of Energy, National Science Foundation
Agency intelligence
Department of Defense
Back to SBIR/STTR Research Awards