SBIR/STTR Research Award

Staging for Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

Award identifier b05d88d946712f33459a76b68a04a95806cf76336988a3a0b02dd3857e892034Awarding agency Department of Energy

Award amount

$149,742

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2014-02-18
Contract end date
2014-11-17
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0000969
Topic code
30a

Research abstract

Linear colliders based on two-beam wakefield acceleration have a modular design. A fundamental requirement of two beam wakefield acceleration that has yet to be demonstrated is the staging of sequential accelerating modules. For a successful staging demonstration two key things have to be addressed: drive beam separation and the timing between wakes from different stages and the witness beam. Timing was typically addressed by sending the drive beam through a 180 bend, but this led to problems with coherent synchrotron radiation and subsequent beam quality degradation. We propose to use a fast strip line kicker for drive bunch train management. We estimate that the power requirement and turn-on time are well within a grasp of current technology. Synchronization of the main (witness) beam with wakefields generated by the drive beam can be done by a series of variable microwave power delay lines, which eliminates the need to bend the drive beam. We propose to use an overmoded TE01 mode based cylindrical waveguide as a delay line because of the reduced power loss of such mode. In Phase I of this project, we will design and build two essential pieces of hardware for the two beam acceleration staging experiment at Argonne Wakefield Accelerator, a fast stripline kicker and an RF delay line. Specifically, a TE10-TE01 rectangular to cylindrical mode converter will be built for wakefield transport and a delay and a stripline kicker will be designed and manufactured. These components will be cold tested and ready for installation at the AWA. Commercial Applications and Other Benefits: Staging is a key experiment that has to be demonstrated for the validation of the wakefield collider concept. If the main (witness) beam can be made synchronous with the drive beam wakefield coming from separate stages and preservation of the main beam emittance can be shown, then a collider at a given energy can be designed by just stacking together the required number of wakefield modules.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.