SBIR/STTR Research Award

Quick Disconnect System for Power Distribution Hardening and Resiliency

Award identifier 48057356b799f0cfb0d0a2b757ae3ca4a46cf998e5155ab461240def2214c71aAwarding agency Department of Homeland Security

Award amount

$99,736

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Homeland Security
Branch
Not reported
Recipient company
STREAMLINE AUTOMATION LLC
Proposal award date
2013-05-01
Contract end date
2013-10-31
UEI
CLW2B8WVV1D4
Solicitation number
HSHQDC-13-R-00009
Topic code
H-SB013.1-005

Research abstract

Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developing a quick disconnect system for utility power distribution cables. The main goal of the innovation is to allow the power cable and support structure to become disengaged safely by adhering to all applicable OSHA, ANSI, IEEE and environmental standards; reliably by implementing both automated disengagement, triggered by detection of critical loads, and mechanical disengagement, resulting from critical loads applied to the cable/support structure; all without causing damage to the cables/support structures. The proposed solution shall create no interference with normal operation by utilizing self-power generation, low maintenance requirements, and an architecture that can be retrofitted to current cable/support structure designs. In the event that restoration is necessary, the proposed solution will be able to be reconfigured with no special tools allowing restoration efforts to be as quick and efficient as possible. The Phase I efforts seeks to show the feasibility of the proposed Quick Disconnect System which possesses a high TRL because the Phase I design can be developed using nearly all OTS hardware and electronics. Phase II seeks to refine, optimize and finalize its design as an immediate means of increasing distribution network resiliency.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

75 SBIR/STTR records share this UEI (2003–2024). Reported award amounts total $23,124,794. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Homeland Security, National Science Foundation, Department of Energy, Department of Health and Human Services

Agency intelligence

Department of Homeland Security

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.