SBIR/STTR Research Award

High Power S-Band Vacuum Load

Award identifier d8b7a8f9741682f806674e87733a39b6fbd454b2077366b32b4b2005883ea705Awarding agency Department of Energy

Award amount

$999,940

Program and phase

SBIR · Phase II

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
MUONS INC
Proposal award date
2013-04-09
Contract end date
Not reported
UEI
V9WAYUJRMVC4
Solicitation number
DE-FOA-0000782
Topic code
10d

Research abstract

S-Band vacuum loads at the SLAC linac are encountering operational problems now that they have to operate under the stringent requirements of the LCLS: 50 MW peak power, 6 kW average power, and extremely tight phase stability for the linac. Failure mechanisms have been studied which suggest an RF surface breakdown of the 200 m Kanthal layer. We propose a novel solution which incorporates mode conversion from TE10 in rectangular waveguide to TE01 in round waveguide. Lossy material will be placed in the round waveguide, and the selection of the TE01 mode minimizes the electric field normal to the surface of the lossy material. This lossy material in the TE01 round waveguide will be mechanically confined in compression (without brazing), in order to eliminate operationally induced tensile stresses in the lossy material. The wrap-around mode converter will be based upon the X-band mode converter invented at SLAC, and the TE01 waveguide load design will be based upon HOM load designs developed by Muons, Inc. In Phase I, a novel lossy ceramic material and a mechanical system for incorporating it into an S-band dry load were designed and tested. The dry load operates in the TE01 mode and incorporates mode converters designed by SLAC. The lossy ceramic components are cast into cylinders and other novel shapes from slurries composed of mixtures of SiC and porcelain and processed to full densification and vitrification. The microwave characteristics of the lossy ceramic cylinders were measured to determine the optimum mixture for various elements of the load. During Phase II, the manufacturing of components with the lossy ceramic material will be studied to find the optimum design for low-cost manufacturing of the complete load. This will include manufacturing processes for the mode converter, minimized post machining of the lossy ceramic material, compression techniques for various sections of the load, optimum configurations of the components to even out the heat load, high power testing and life tests. Commercial Applications and Other Benefits: This dry load system will have a wide range of application from beam line HOM loads to TE01 dry loads. Every SRF accelerator will benefit from the use of this material. The ability to cast the material into novel shapes allows for low cost solutions which would otherwise be prohibitive due to machining costs of more traditional lossy ceramics.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

76 SBIR/STTR records share this UEI (2002–2022). Reported award amounts total $25,854,929. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.