SBIR/STTR Research Award

30a Affordable, efficient injection locked magnetrons for superconducting cavities

Award identifier cbb29ccae2bae34bafa184e37bd227f95f30d6b59f26dfe8a790ecd90e5ba8dbAwarding agency Department of Energy

Award amount

$200,000

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
MUONS INC
Proposal award date
2022-06-27
Contract end date
2023-03-26
UEI
V9WAYUJRMVC4
Solicitation number
Not reported
Topic code
C54-30a

Research abstract

RF sources for accelerator applications are dominated by expensive klystron technologies. Life cycle costs require replacement of the entire microwave tube at the end of life. End-of-life for the RF source is a combination of the power supply design and microwave tube design with failures the result of a combination of these two expensive components where the microwave tube is the fuse. GENERAL STATEMENT OF HOW THIS PROBLEM OR SITUATION IS BEING ADDRESSED. Magnetrons offer a solution to the life cycle costs of klystron technologies for three reasons: 1) Magnetron efficiency is greater by a factor of two or three times that of a klystron, 2) Replacement of the magnetron does not mean replacing the magnet or launcher as is required of a klystron, and 3) The lifetime of the magnetron tube is limited by the filament power supply operation, which can be improved. In this proposal we concentrate on the efficiency enhancement of a 650 MHz magnetron. 900 MHz magnetrons operate at greater than 80% efficiency, while 2.45 MHz magnetrons operate around 70%. It is anticipated that the 650 MHz magnetron efficiency will operate in the 85-90% range. WHAT WILL BE DONE IN PHASE I. In Phase I of the project proposed here, Muons Inc. will design a 650 MHz magnetron prototype to satisfy the requirements of the Solicitation Topic. The efficiency will be optimized by proposed surface treatments of high current regions and the design will incorporate techniques for minimizing the high current regions between the anode and tip of the antenna. The vane and strap anode design will incorporate design improvements to the high current region of the straps by optimizing their geometries. COMMERCIAL APPLICATIONS AND OTHER BENEFITS Muons is a proponent of Mu*STAR Superconducting RF Linac Accelerator Driven Subcritical Molten-Salt Reactors, which can burn Spent Nuclear Fuel (SNF) from past present or future nuclear reactors to make affordable electricity and process heat. Inexpensive and reliable magnetron power sources at 650 MHz are part of our vision to simultaneously turn SNF into a valuable commodity and to produce carbon-free nuclear power to address climate change.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

76 SBIR/STTR records share this UEI (2002–2022). Reported award amounts total $25,854,929. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.