SBIR/STTR Research Award

Seamless SRF Cavity Fabrication by Spin-Necking and Hydroforming

Award identifier 8a511edcf6959cbccc2162a060bc93a1ffcd289fe7e3317434832ff0bf193d92Awarding agency Department of Energy

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
DMS-South/Bailey Tool LLC
Proposal award date
2013-02-19
Contract end date
Not reported
UEI
MNSEYRBH8JM7
Solicitation number
DE-FOA-0000760
Topic code
34 b

Research abstract

Superconducting radio frequency (SRF) cavities for use in the International Linear Collider (ILC) are currently fabricated by electron-beam welding of press-formed half-cell cups. Cavities produced in this method experience weld-related defects that limit accelerator performance and increase the cost of supplying the SRF system to the end user. E-beam welding in its optimum state is expensive and causes additional manufacturing risk and lead time. This project will develop a weld-free cavity forming process which will eliminate welds and weld-related defects and therefore reduce cavity cost. The primary reference model will be the 1.3 GHz 9-cell TESLA-style SRF cavity but the objective will be to produce a 3-cell cavity. The sequential forming processes of spin-necking and hydroforming will be employed to produce cavities from a single, weld-free tube of cavity metal. Cavity irises and equators will be mechanically formed on a spinning machine and ultimately a hydroforming press to produce final cavity geometry. Copper will be employed for this Phase I project. The Work Plan objective is to produce a spin- necked perform portion of the seamless cavity forming process, leaving the hydroform stage to a Phase II work plan. However, hydroform tooling system design will be performed in the Phase I Work Plan so that the system will be ready for construction in the proposed Phase II and III commercialization stages of the project. The Phase I Work Plan will verify methods development previously performed by Proposer through numerical analysis of spin-necking and hydroforming and then operate a spin-necking process to produce a spin-necked tube, ready for the subsequent hydroform process.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

5 SBIR/STTR records share this UEI (2012–2020). Reported award amounts total $557,823. Reported amounts are not federal obligations.

Phases: Phase I

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.