SBIR/STTR Research Award

Hydroformed Low Impedance Bellows for JLEIC

Award identifier 1708ce35401bba9ba0f476292b56ea2a98d28444217c784f17d3f87c96dc881dAwarding agency Department of Energy

Award amount

$199,780

Program and phase

SBIR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
DMS-South/Bailey Tool LLC
Proposal award date
2020-02-18
Contract end date
2020-11-17
UEI
MNSEYRBH8JM7
Solicitation number
DE-FOA-0002145
Topic code
33a

Research abstract

Bellows for particle accelerators are currently manufactured using precision welding assembly and on some occasions require copper plating. Successful plating is challenging when considering complications of internal bellows surfaces and the technical challenges of metal-electro-deposition processes. Coating variability and flaking of coatings in situ are common and represent expensive failure modes. The objective of this project is to develop methods to substitute a more robust deposition process for final copper coatings. Tubular deep-draw and hydroforming processes will be employed. A cladding process between stainless and copper sheets with subsequent conversion to tubes for hydroforming will be used to apply copper to the bellows which can be fine-tuned in thickness by electro-polishing after final assembly. Bellows forming processes will be designed and developed based on experience in deep- drawing and hydroforming processes derived from manufacturing superconducting radio frequency cavities. Tailored cladding will be developed for application of copper layers to stainless or other substrates. Finite element analysis will be used as needed to predict, trouble-shoot and validate forming processes. Prototype tooling will be designed and built and sample forming and cladding trials will be conducted to develop optimal manufacturing processes. Finally, reduced scale finished samples will be submitted to Jefferson Lab for review and characterization. Improving the quality and cost of U.S.-produced particle accelerator and vacuum system components would have a meaningful impact on domestic capacity to participate in the growing global construction of accelerator systems for scientific and industrial uses. A decline in the US industrial base inthese sectors could be reversed by successful development and marketing of novel and improved copper deposition methods and other future developments. Successful execution has broad commercial application on a global scale.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

5 SBIR/STTR records share this UEI (2012–2020). Reported award amounts total $557,823. Reported amounts are not federal obligations.

Phases: Phase I

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.