SBIR/STTR Research Award

Advanced Manufacturing and Testing of Seamless High-Purity Niobium Superconducting Radio Frequency Cavities

Award identifier 7ee172a83ea8adb1373a98dab49f983220f32634fa769706ab837a0c9f8e134cAwarding agency Department of Energy

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2012

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
ULTRAMET
Proposal award date
2012-02-20
Contract end date
2012-11-19
UEI
N8ZRMWX85NZ6
Solicitation number
DE-FOA-0000577
Topic code
29 b

Research abstract

Niobium superconducting radio frequency (SRF) cavities provide high continuous wave operating fields while offering high beam quality and low beam-cavity interaction. Extensive research is being conducted worldwide to develop cost-effective processing for large-scale production of niobium SRF cavities of acceptable purity and surface finish for multiple particle accelerator projects. Chemical vapor deposition (CVD) processing techniques are being developed for fabrication of seamless high-purity niobium SRF cavities. Innovative SRF cavity fabrication techniques combining CVD and mandrel utilization and removal procedures are being developed with the intent of eliminating, or substantially reducing, the need for electron beam welding and many costly, time-consuming, and often performance-limiting fabrication steps currently used. Performance testing will be conducted. Commercial applications and other benefits: Particle accelerators have become the tool of choice for fields as diverse as high-energy physics, ion implantation, medical treatment, waste sterilization, nuclear waste transmutation, airport security, food preservation, spallation neutron physics, and coherent light research. The proposed CVD processing technique has excellent potential for substantially reducing the cost of fabricating high-performance accelerator cavities and minimizing the need for electron beam weld attachment. It is uniquely well-suited for the net-shape fabrication of complex component geometries, such as accelerator power couplers, that are difficult or impossible to form by conventional hydro- and spin-forming methods.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

380 SBIR/STTR records share this UEI (1983–2025). Reported award amounts total $105,154,309. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation, Department of Transportation, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.