SBIR/STTR Research Award

A 17 GHz High Gradient Linac having Molybdenum Surfaces in the Peak Electric Field, Dark Current Interception Regions of the Structure

Award identifier 9ba03edb8ddbde22a284e9a56d9032bea6e8d15a049cbfb1ec340171f6fe353aAwarding agency Department of Energy

Award amount

$934,054

Program and phase

SBIR · Phase II

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Haimson Research Corporation
Proposal award date
2011-08-15
Contract end date
2013-08-14
UEI
Not reported
Solicitation number
DE-FOA-0000508
Topic code
65 a

Research abstract

While design improvements have been achieved, considerable difficulty continues to be encountered in the development of accelerator structures for future linear colliders required to operate with long term reliability at loaded average accelerating gradients of 100 megavolts per meter and radio-frequency pulse lengths in the range of 150 to 250 nanoseconds. A recently completed series of high power radio-frequency and electron beam tests comparing two similar geometry linac structures, each tested with a 17 gigahertz dual resonant ring power amplifier under the same radio-frequency conditions and breakdown rates, has demonstrated an electron beam verified, 25 percent increase in the accelerating gradient of a 22-cavity linac structure by replacing the copper surface around the periphery of each contoured disc iris with high temperature brazed stainless steel. This higher gradient performance presented a compelling argument for avoiding the use of copper surfaces in the beam apertures of high gradient linac structures, and encouraged investigation of alternate metals to further improve the gradient and to avoid the undesirable high losses associated with stainless steel. Ongoing studies and radio-frequency measurements have supported molybdenum as a strong candidate for replacing the copper irises because of the low surface resistivity and superior strength and thermal properties. The fabrication and evaluation of brazed copper/molybdenum short test structures during the Phase I effort confirmed the low loss radio-frequency characteristics of molybdenum, and verified that the structure resonant frequencies remained essentially unchanged after successive braze cycles. Also, during Phase I, microwave and physical design parameters, compatable with an existing dual resonant ring high power test amplifier, were established for a 2/3 mode, 22-cavity, copper/molybdenum linac structure, including the dual feed racetrack shaped input and output couplers. During Phase II, detailed designs and fabrication of the copper/molybdenum accelerator structure shall be completed, and the final tuned test linac and resonant ring system shall be installed in an existing 17 gigahertz linac test facility. A further Phase II objective is to complete an extended sequence of high power tests so that the high gradient performance of the new copper/molybdenum structure can be compared directly with that of the recently tested all-copper and copper/stainless steel structures. Commercial Applications and Other Benefits: Success of the Phase II effort would lead to a better understanding of radio-frequency breakdown in traveling wave linear accelerators and would provide design guidance for further miniaturization of commercial accelerators for medical, radiographic and homeland security applications.

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.