SBIR/STTR Research Award

High-Gradient Two-Beam Electron Accelerator

Award identifier da142d436f59adac372a268a15b69a5d6c5ea1ebc26ceff81c66df2780cdb88fAwarding agency Department of Energy

Award amount

$1,000,000

Program and phase

SBIR · Phase II

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Omega-P, Inc.
Proposal award date
2011-08-15
Contract end date
2013-08-14
UEI
Not reported
Solicitation number
DE-FOA-0000508
Topic code
65 a

Research abstract

In a two-beam accelerator, a high-current drive beam imparts energy to a low current test beam by generating microwave power that flows from one beam to the other. The largest project of this sort is CLIC, located at CERN in Geneva, Switzerland, that is being designed for operation at an electron-positron center-ofmass energy as high as 3 TeV. Technical complexity and low efficiency characterize the design for this project, creating technical hurdles that present serious challenges for its designers. This project proposes a new approach to two-beam acceleration by employing detuned cavities in its accelerator structure. In this way, it is possible for both the drive beam and test beam to traverse the same cavities. This could allow operation at higher acceleration gradients than CLIC because of the possibility of exciting the cavities in more than one mode simultaneously, and could allow a higher efficiency for power transfer between one beam and the other. Theoretical and computational analysis was carried out to establish a conceptual design for experiments to be conducted during Phase II. Plans for the experiments, and for further supporting analysis, were formulated. Test cavities will be built, and configured into a short accelerator structure, for measurements of transformer ratio and acceleration gradient, when the structure is driven by the modest current beam from an available 6-MeV RF gun. Analysis will be continued to improve understanding of this novel accelerator configuration. Commercial Applications and Other Benefits: For construction of a future multi-TeV electron-positron collider, costs will scale down as the working acceleration gradient rises and as the complexity of the device falls. Thus one benefit from use of the proposed accelerator structure could be a drop in the cost of the machine. This couldin turnincrease the likelihood that the international funding agencies needed to support such an endeavor will react positively to a proposal to underwrite the collider

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.