SBIR/STTR Research Award

Thermal Management System for Long-Lived Venus Landers

Award identifier 10b209679cebaa9538381b1b3648320bbb87f88ac64528d47930a67e091521e6Awarding agency National Aeronautics and Space Administration

Award amount

$599,949

Program and phase

SBIR · Phase II

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
ADVANCED COOLING TECHNOLOGIES INC
Proposal award date
2011-06-01
Contract end date
2013-05-31
UEI
Z8KVZV3DR7J4
Solicitation number
Not reported
Topic code
S3.03

Research abstract

The overall program objective is to develop a high-temperature passive thermal management system for the Radioisotope Power Conversion system that energizes the refrigeration system applicable to Venus missions. The innovation consists of a high temperature alkali metal variable conductance heat pipe (VCHP) integrated with a two-phase heat collection / transport package from the General Purpose Heat Source (GPHS) stack to the Stirling convertor heater head. The thermal management system collects the heat from the GPHS modules, and delivers heat as required to the Stirling system. Any excess heat is removed by the VCHP. Excess heat must be removed when the Stirling system is shut down, or in the early stages of a mission powered by a short-life radioisotope. In Phase I, it was demonstrated experimentally and theoretically that the VCHP allows the Stirling convertor to: stop during transit to Venus, pre-cool the system before re-entry, work on Venus and execute brief stoppages on Venus. The reservoir is exposed to the environment temperature during the mission and this is a key for the HTTMS to work passively. The other component of the system, the two-phase heat transport package (HTP), minimizes the temperature drop between the multi-GPHS stack and the heater head. In Phase II, a full scale HTTMS will be designed and a representative multi-segment of the full scale HTTMS will be build and tested in relevant environment. This multi-segment contains two or three parallel/redundant heat paths from the simulated GPHS stack to the heater head simulator, in addition to the backup cooling system (VCHP). The full-scale multi-segment HTTMS will be integrated and tested with the corresponding full scale multi-segment of the Intermediate Temperature Thermal Management System (ITTMS) of the Venus Lander.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

282 SBIR/STTR records share this UEI (2003–2026). Reported award amounts total $118,415,811. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation, Department of Agriculture, Department of Health and Human Services

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.