SBIR/STTR Research Award

SBIR Phase II: IDT Sensors for Monitoring Wind Energy Infrastructure

Award identifier fe01beb12d1d02f26348ff2506b3d7bb6d5a5010140c1177ab1882592c51f742Awarding agency National Science Foundation

Award amount

$499,734

Program and phase

SBIR · Phase II

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
Mound Laser & Photonics Center, Inc.
Proposal award date
2011-02-15
Contract end date
2013-01-31
UEI
HLL3FPWKBJK3
Solicitation number
Not reported
Topic code
Phase II

Research abstract

This Small Business Innovation Research (SBIR) Phase II project will demonstrate an inspection and monitoring sensor system that addresses the problem of structural evaluation of composite components with an innovative nondestructive evaluation (NDE) sensor system. Composites have always been a challenge for inspection due to their multilayer and anisotropic material construction. This challenge is increased when dealing with wind turbine blades due to their enormous size, construction, strength requirements, operational environment, and safety considerations. The Phase II effort will further upgrade and refine the sensor operational capabilities developed in Phase I. The signal to noise ratio and inspection coverage area (sensor footprint) will be further improved. The system capability will be expanded so that a single control unit can operate and receive data from a networked array of sensor. The sensor system will have application during manufacture to verify part quality, for pre- and post-installation inspection to check for shipping or assembly damage and during the component?s service life as a structural health monitor system. These sensors offer the possibility for substantial savings and reduction of downtime as manufacturing defects are discovered at the point of origin, before catastrophic blade failure can occur. The broader impact/commercial potential of this project will be to facilitate the economical installation and operation of wind energy generators. The U.S. has set a goal of 20% (300GW) of electrical power to be generated from wind by 2030. Based on the typical utility scale turbine (1.5-2.0MW) this translates to having over 500,000 turbine blades in domestic service by 2030. Depending on the wind turbine size, blade costs are $55k to $300k each with a 1.5-2.0MW turbine costing $2-3M to install. The growth of wind energy represents a huge manufacturing challenge to produce, install and maintain the turbine blades. The sensor system developed during this program has the potential to detect defects or damage both early in the supply chain and during the life cycle so that expensive energy capacity downtime or catastrophic tower failures can be avoid. Blade failure is not only a cost issue but also a safety one as well. An accurate method for inspection of complex blade structures can have a major economic impact on the industry. The sensor system being developed also has use in Aerospace and Infrastructure/Bridge applications.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

36 SBIR/STTR records share this UEI (1996–2015). Reported award amounts total $11,357,971. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Science Foundation, National Aeronautics and Space Administration, Department of Energy, Department of Health and Human Services

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.